Deethanizer Rail Car Project
Multiple Bengal divisions worked together to transport a 440,000 lb deethanizer column from the fabrication shop to location of rail spur. Planning for project was 2 months long. Over 600 mats were used for road improvements. The rail cars were prepped with saddles for the load, the deethanizer was loaded onto rail car and secured with cables that were specially engineered and fabricated for project.